Cement Storage - Portland, New Zealand
05/26/2017 · 10:21am
This large bolted RTP silo stores dry, free-flowing cement. It sits upon an enclosed structural steel and cement elevated platform, and can withstand hurricane force winds.
This large bolted RTP silo stores dry, free-flowing cement. It sits upon an enclosed structural steel and cement elevated platform, and can withstand hurricane force winds.
Tank Connection was chosen for this massive water storage facility in Singapore. The project features 13 water storage tanks for reverse osmosis flush/feed applications. Five of these tanks are 135.39 feet (41.27 m) in diameter by 46.08 feet (14.05 m) in height, with a capacity of 4,755,096.9 gal (18,000 cubic meters) each, and feature aluminum geodesic dome covers.
Tank Connection construction crews installed this Barge-to-Truck transloading terminal with a 127’ tall by 41.5’ diameter RTP bolted Cement Storage Silo to store and transfer cement from ocean barges. Tank Connection also designed, supplied and installed the pneumatic conveying piping and the unloading system.
Biothane was selected for construction of a wastewater facility in support of a distillery in St. Croix. The large digesters utilize a base setting ring (BSR) design and are fitted with a floating membrane cover. The effluent buffer tank utilizes a BSR and is designed to accept a double “gas holder” membrane cover. Equalization tank utilizes BSR design and is open top. Post aeration tank utilizes BSR design and steel pressure deck design supplied by Tank Connection.
Tank Connection was chosen for this bolted RTP (rolled, tapered panel) construction tank that has a capacity of over 170,000 gallons for fire protection water usage in Texas.
This is the first tank that Tank Connection utilized this style of rafter ring. The rafter ring was designed to set within 1 inch of the grating level per customer request. In addition, the nozzles were designed to protrude through the platforms to give the customer access to bolt the piping to the flanges. This was a special request by our customer, and they were very happy with the result.
Tank Connection was selected to design, manufacture and install a turnkey package for over 4 million gallons of frac water storage. The customer owns and operates their own oil and gas wells and contacted Tank Connection to assist in finding the most economical storage solution for their frac sand operation.
This state of the art facility consists of (6) 2000 MT silos with a total operating storage capacity of 8,000 cubic meters. Unique to this facility is the support for both rail and truck material receiving.
This power facility required a pebble lime silo, recycle ash silo and two welded well water tanks for their scrubber and baghouse project. Our pebble lime silo included multiple interior equipment levels, stairs, platforms, entryways, and extensive shell penetrations for customer piping and equipment.